I need some advice regarding the labor cost for adding a stall shower to the existing powder room.
This involves:
Removing present sink and vanity and tiled floor.
Removing the existent front wall that has the door and extend it by two more feet to accommodate the pedestal sink.
Install the new stall shower.
Build the front wall and new door, ie., rebuild the bathroom to the size of 64 in x 92 in.
The present toilet will be undisturbed, and the shower drain will be diverted to the drain from the toilet after removing the tiled flooring.
Tiling the floor and rest of the wall.
Installing new pedestal sink, faucets, medicine cabinet, lights, painting.
The guy is a carpenter by training, one man company and has a plumber buddy to do the plumbing part. Appears confident of the work.
He said it may take a week or less and labor only $6000.00.
I will buy all the materials.
Is it a good price? Thanks.
--100.11.xxx.xxx